SewTrak

Garment resource planning and production tracking in one factory workspace.

Plan styles, load lines, track live output, monitor HRIS, close orders and see performance KPIs without waiting for end-of-day reports.

SewTrak production tracking and factory control

What SewTrak controls

From order plan to final dispatch.

SewTrak is built around the way garment factories actually work: orders, styles, operations, lines, operators, WIP, dispatch and OTIF.

Production planning

Manufacturing orders, capacity, Gantt, line loading, route and style changeover readiness.

Live tracking

Hourly board, line board, operator output, transfer and WIP, production entry and alerts.

Performance KPIs

Planned vs actual output, efficiency, RFT, absenteeism, plan adherence, cost per piece and OTIF.

Operation bulletin

SAM, manpower needed, machine, attachment, skill and operation sequence for each style.

Workforce and HRIS

Headcount, operator strength, attendance, attrition, machine-man ratio and labour cost per piece.

Roles and access

Separate access for tenant admin, planner, supervisor, IE, production manager, quality, HR and viewer.

Product proof

SewTrak is ready to demo.

Browse all six working screens from the demo workspace. Filter by module or click any thumbnail to inspect the full view.

For decision-makers

See the day before the day is over.

SewTrak gives owners and managers a common view of production flow, delivery risk, line efficiency and people availability. It turns factory data into action.

Rollout path

From demo to daily factory use.

Demo

Walk through dashboard, planning, production entry and HRIS in a live demo workspace.

Pilot lines

Configure styles, roles and boards for selected lines. Run parallel with existing tracking briefly.

Factory rhythm

Expand to more lines with 10 AM and 4 PM review using SewTrak as the control screen.

FAQ

SewTrak FAQ

Does SewTrak replace our ERP?

No. SewTrak focuses on garment planning, production tracking, HRIS views and KPI control. It can start alongside Excel or ERP data.

How long does rollout take?

A demo workspace can be shown immediately. Pilot rollout on live lines often starts in 2–4 weeks depending on data readiness.

Who uses SewTrak day to day?

Planners, supervisors, IE, production managers, quality, HR and owners — each with role-based screens.

Can we buy SewTrak without transformation?

Yes. SewTrak is a standalone product when live visibility is the main bottleneck.

Book a SewTrak demo.

We show planner, tracker and dashboard flow in a working demo factory workspace.

Request demo
WhatsApp